Belgravia Mews

A complete retrofit of a substantial property in Belgravia.

Interior of a refurbished Victorian Building, refurbished as a stylish contemporary of

Location: Adjacent to Belgravia and Royal Parks Conservation Areas, City of Westminster (London)

Anticipated completion: Spring 2024

Construction cost: £660, 000

Total area: 418.5 sqm (NIA) / 4505 sf

Value added:

Significant improvement in rental rates will be achieved, particularly on the first floor, where the existing suspended ceiling was removed and opened up to the double gable pitched roof. New timber frame, double-glazed heritage windows will also improve street presence and tenant appeal. Restoration of the existing terrazzo staircase and opening up the staircase enclosure with a glazed wall creates a dramatic new focus in the entrance hall, in a way that is cost-effective to the client yet impactful for prospective tenants.

Sustainability:

The newly insulated pitched roof, paired with replacement double-glazed street front windows, will improve the thermal envelope, thereby reducing energy consumption. Operable rooflights will allow hot air to escape without the need for air-conditioning. The existing gas boiler is being removed to eliminate reliance on fossil fuels for heating.

Testimonial:

“We have worked with 4 S Architecture to add value to a number of challenging heritage properties, including the Grade II listed buildings at 100 Pall Mall, 10 Grosvenor Place, and 1-17 Ulster Terrace, as well as this mews property in Belgravia.

With their knowledge of historic buildings, and their commitment to high-quality design, 4 S Architecture developed innovative design solutions that were granted listed building consent. 4 S Architecture are a realiable practice with a collaborative attitude, working seamlessly with us and letting agents to take onboard market-led design requirements throughout the process. Their ability to respond quickly on site to unexpected conditions also ensures that opportunities to add value are taken advantage of, and the project progresses smoothly through construction to a successful end product.”

Stuart, Asset Manager